Tokyo Eastern Cement, Trincomalee
Units
HISENSE VRF system (Indoor units: 54,600 BTU/hr, Outdoor units: 153,500 to 232,000 BTU/hr)
Project Requirements
High-performance HVAC system for optimal temperature control at a manufacturing facility.
Solution Delivered
Solution Delivered: Installed HISENSE VRF systems.
Prime Lands Luxury Apartments, Dehiwala
Units
Hisense Air Conditioning Systems (9000 BTU, 12000 BTU, 18000 BTU, 24000 BTU)
Project Requirements
Reliable and efficient cooling solutions for a multi-storied luxury apartment complex.
Solution Delivered
Installed Hisense air conditioning systems with anticorrosive treatment.
Pioneer Knitwear BD Ltd.
Units
2 (FD 240), 1 (FD 520)
Project Requirements
Humidity control for dry rooms to prevent fabric damage and improve production efficiency.
Solution Delivered
Supplied and installed advanced dehumidifier machines, including FD 240 and FD 520 units.
Universal Jeans Ltd., Bangladesh
Units
1 (Fral FD520)
Project Requirements
Humidity control for optimal production conditions, preventing fabric damage and improving efficiency.
Solution Delivered
Installed a Fral FD520 Dehumidification System with a 4600 mc/h airflow capacity.
Barceló Whale Lagoon Maldives, Bodufinolhu Island
Units
Industrial Laundry System (Washers, Dryers, Ironers)
Project Requirements
High-performance laundry system to support high-demand operations at a luxury resort.
Solution Delivered
Installed energy-efficient washers, dryers, and ironers – laundry systems.
Sobadhanavi Power Plant, Kerawalapitiya
Units
4 Nos. TEKSAN Power Generators (Total Capacity: 8MW)
Project Requirements
Reliable backup power generation to support the operations of the 350MW LNG power plant.
Solution Delivered
Supplied, installed, and synchronised 4 TEKSAN generators powered by Mitsubishi engines, delivering a total of 8MW.
WDS International
Units
10 kVA TEKSAN Generators
Project Requirements
Reliable backup power for cold storage facilities to prevent disruption during power outages.
Solution Delivered
Supplied and installed 10 kVA TEKSAN generators across multiple WDS International locations.
R-Pac (Bangladesh) Limited – Dhaka, Bangladesh
Units
Complete MEP Installation (Fire Pumps, Electrical Systems, Plumbing)
Project Requirements
Full-scale MEP implementation for a newly constructed commercial building.
Solution Delivered
NativeWay Bangladesh Ltd. delivered complete MEP systems, including high-pressure fire pumps, a 3000 kVA transformer, solar panels, and integrated plumbing solutions.
Cargills Ceylon PLC – Moragahahena, Sri Lanka
Units
100 kVA TEKSAN Generator
Project Requirements
Reliable backup power for uninterrupted retail operations.
Solution Delivered
Installed a 100 kVA TEKSAN Generator.